This is an original legacy property which is exhibiting CMU cracks throughout all buildings. There were a few areas were sealants were applied but not through out the entire property. Action is required to mitigate CMU crack expansion. See attached Photos FRONT PARKING/OFFICE Back Fill cement – vertical ridges by front office. Building B: Unit B41 replace bollard, Tuck and point Unit B46 column on each side require tuck and point left Unit B46 CB above roll up doors entire lintel Tuck and point crack by unit 60 Building C: Reset and replace bollard by unit 7 Tuck and point next to electric room and unit 7 Unit 9 tuck and point Existing Sealant needs to be painted white, tuck and point by unit 55, Building D: Unit 136 missing CMU piece need to patch and cement back filled Tuck and Point unit bottom CMU Tuck and Point units 202,203,204 Unit 213 Tuck and Point Unit 214 above Roll Up Door 3 CMU bulging require demo and replacement Electric Room Door Tuck and Point above lentil Building E: Electric door – replace lintel and tuck and point Unit 16 Column tuck and point Unit 20 Missing piece of CMU, Unit 28 tuck and point Unit 31 tuck and point Approx 4,000.

Area of work must be painted with PS paint specs. Please reset two bollards that have been hit by cars.

  • salem Project
    Exterior Drain and Asphalt
  • Liverpool Project
    Exterior Drain and Asphalt
  • Liverpool Project
    Exterior Drain and Asphalt
  • Liverpool Project
    Exterior Drain and Asphalt
  • Liverpool Project
    Exterior Concrete and Paint
  • Liverpool Project
    Exterior Concrete and Paint
  • Liverpool Project
    Exterior Concrete and Paint
  • Liverpool Project
    Exterior Concrete and Paint
  • Liverpool Project
    Exterior Concrete and Paint
  • Liverpool Project
    Exterior Concrete and Paint